It was cut up at CF Booth
High quality 5-pole motor with two large flywheels
as was a small fleet of ex GNR J52 steam locomotives but their trial was unsuccessful
by which time it was half way through a repaint into large logo
Drain cocks Handrails Lamp irons Oil lubricators Pipe work Safety valve Smokebox door dart Smokebox door numberplate Water tank caps Whistle Bufferbeam detail (in detailing pack)
7027 - LNER J68 - DCC Sound Fitted Coil-A It was cut up atThe second batch of Hills improved 0 6 0T locomotives, GER Nos. 21 30 to Order G75, differed from the initial C72 order by being designated for shunting duties and differed in build accordingly. Sixteen spoke, unbalanced cast iron wheels were fitted, along with lever reverse and the side tanks were straight topped, lacking the raised chambers of the passenger tanks. Steam brakes were fitted from new, along with a wide rimmed, parallel sided chimney,